Repository navigation
Description
Part of #1. Ready after the first valid baseline and candidate manifest to establish the dated reporting/dispatch lane.
Implements / Consumes
Consume #21's full-run contract/baseline, #22's candidate manifest, atom.benchmarks.results.aggregate/verify_bundle and existing ownership/phase/request receipts. Use Root's daily 20:07 Asia/Shanghai dispatch; no new scheduler service.
File set
tools/k31_daily_report.py, tests/test_k31_daily_report.py, docs/k31-daily-measurements.md.
Exit criteria
Reuse #21's first dated tracking issue under #1 and report row; produce subsequent dated rows with canonical throughput, 90th-percentile full-response interactivity, 90th-percentile TTFT, E2E-normalized interactivity, request/error/cancellation ledger, actual spans, source/configuration/roster, quality and cleanup. Compare with fixed baseline and previous valid same-series daily result; missing comparator is explicit. Preserve synthetic flags and invalid attempts.
Key dispatch records by Asia/Shanghai date/candidate fingerprint. Repeated/concurrent triggers reuse the existing reservation/run/result; busy ownership queues without preemption. Keep failed/blocked attempts; replacement requires a concrete repair, independent exact-plan qualification and new attempt identity. Record unchanged candidates; essential recipe changes create a new comparison series.
Tests consume real-format existing result/ledger fixtures to reject invalid comparisons, wrong metrics, duplicates and incomplete cleanup. Verify the first baseline row and its issue linkage. Daily reports do not waive #1 acceptance/landing gates.
Named result
A reproducible daily dispatch/report procedure, demonstrated on #21's already published baseline row, that prevents duplicate date/candidate dispatch.
Effort
Code: 350 added, 0 moved, 0 deleted; weighted 350. Tests: 180 added, 0 moved, 0 deleted; weighted 180. Standard CPU gate applies.
Daily contract and final acceptance
Root owns scheduling and GPU leases, using the app's existing daily automation/coordination and the shared GPU ownership lock. The report command provides a small reservation/result ledger; it neither starts a scheduler daemon nor self-grants execution. At 20:07 freeze the latest qualified runnable combination, inspect the date/candidate record, and queue or request the existing independently qualified run. A first baseline completed earlier the same date/candidate already satisfies that intended run; do not launch it again. An unchanged candidate on a later date remains an explicitly unchanged daily measurement. Keep scheduled date, actual execution timestamps and queued status distinct across midnight. Derive runnable-candidate identity from the executed inference-source/patch closure, dependencies, flags and fixed configuration/runtime identities; retain full commits as provenance. Mutable evidence/quality status and measurement-tool-only changes cannot manufacture a new intended candidate run. Record status separately; a controller repair is a qualified replacement attempt under the same candidate, not a new candidate identity. Failed or pending attempts are never selected as the previous valid comparator.
Use canonical summary.request_metrics.throughput.per_gpu.total_tput_tps and summary.request_metrics.latency.full_response_intvty.p90; E2E-normalized interactivity is 1 divided by the 90th percentile of request_latency_s/actual_output_tokens. Verify the actual 3600-second profiling command, complete eligible ledger, server stability and release separately from bundle completeness. Compare only full 3600-second C12 records with matching dataset/client/precision/golden and hardware/runtime controls, and disclose actual GPU count/concurrency. The existing recipe_fingerprint includes software identity, so keep that complete canonical fingerprint but do not require its equality across an intended ATOM/AITER source treatment. Record exact changed commits separately from frozen workload/draft/precision/serving/hardware/runtime comparison controls. An unexplained mismatch refuses a delta; essential control/runtime changes start a labeled new series. Do not modify canonical fingerprint semantics or hide dependency changes. A failed day gets a dated failure/blocked record, not a fabricated full-run result or automatic second attempt.
The owner explicitly permits daily experimental combinations after source review, relevant numerical checks and bounded model smoke with quality pending. Full natural GSM8K 5-shot, 1319 examples, cap256, fixed seeds, >=96% flexible-extract and no significant paired degradation remain required for adoption. Final acceptance still requires 8003 total tokens/s/GPU and 128.5 full-response interactivity in the same valid full 3600-second C12 run, with TTFT/E2E guardrails and stability. The report labels these gates independently; nonsignificance is not equivalence, and a daily result is not release approval.
The dated tracking issue contains source/candidate/recipe hashes, links to raw/bundle evidence and the report row; use native parent/sub-issue linkage where available. Read existing dated records before creating one. All technical GitHub prose is English and linted. Preserve historical failed #6/#12, retired #14 and original failed #19 producer records.
Activity