CMP-4409: Add per-package coverage tracking to make test-unit#1289
Open
rhmdnd wants to merge 1 commit into
Open
CMP-4409: Add per-package coverage tracking to make test-unit#1289rhmdnd wants to merge 1 commit into
rhmdnd wants to merge 1 commit into
Red Hat Konflux kflux-prd-rh02 / Konflux kflux-prd-rh02 / compliance-operator-dev-on-pull-request
failed
Jul 10, 2026 in 17m 34s
Failed
Konflux kflux-prd-rh02/compliance-operator-dev-on-pull-request has failed.
Details
- Namespace: ocp-isc-tenant
- PipelineRun: compliance-operator-dev-on-pull-request-cvqth
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 3 seconds | |
| 🟢 Succeeded | 28 seconds | |
| 🟢 Succeeded | 52 seconds | |
| 🟢 Succeeded | 6 minutes | |
| 🟢 Succeeded | 16 minutes | |
| 🟢 Succeeded | 5 minutes | |
| 🔴 Failed | 5 minutes |
Loading