chore(deps): update docker images - #746
Open
red-hat-konflux[bot] wants to merge 1 commit into
Open
red-hat-konflux[bot] wants to merge 1 commit into
red-hat-konflux[bot] wants to merge 1 commit into
Red Hat Konflux / Red Hat Konflux / tas-components-v1-4-enterprise-contract / pr group
failed
Sep 19, 2026 in 11m 17s
Failed
Integration test for pr group snapshot tas-components-v1-4-20260919-054052-403 and scenario tas-components-v1-4-enterprise-contract has failed
Details
- Pipelinerun: tas-components-v1-4-enterprise-contract-qnsw6
| Task | Duration | Test Suite | Status | Details | Note |
|---|---|---|---|---|---|
| collect-keyless-params | 8s | ✔️ Reason: Succeeded | ✔️ Reason: Succeeded | ||
| verify | 48s | ❌ FAILURE | ✔️ 1461 success(es) ❌ 24 failure(s) |
The group snapshot is generated for pr group konflux/mintmaker/release-1.4/docker-deps and the component snasphots as below:
| Component | Snapshot | BuildPipelineRun | PullRequest |
|---|---|---|---|
| logsigner-v1-4 | tas-components-v1-4-20260919-052801-000 | logsigner-v1-4-on-pull-request-qxqn5 | trillian |
| logserver-v1-4 | tas-components-v1-4-20260919-053310-000 | logserver-v1-4-on-pull-request-gh49j | trillian |
| redis-v1-4 | tas-components-v1-4-20260919-052355-000 | redis-v1-4-on-pull-request-b6bqk | trillian |
| database-v1-4 | tas-components-v1-4-20260919-052959-000 | database-v1-4-on-pull-request-6hm74 | trillian |
| certificate-transparency-go-v1-4 | tas-components-v1-4-20260919-040529-000 | certificate-transparency-go-v1-4-on-pull-request-sp2x2 | certificate-transparency-go |
Loading