Skip to content

feat: update llama.cpp to 936918514 (#2348) #3713

feat: update llama.cpp to 936918514 (#2348)

feat: update llama.cpp to 936918514 (#2348) #3713

Triggered via push August 10, 2026 09:40
Status Failure
Total duration 12m 2s
Artifacts –

test.yaml

on: push
download-model
32s
download-model
build-macos-intel
8m 1s
build-macos-intel
Matrix: build-linux
Matrix: build-macos
Matrix: build-windows
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build-linux (3.11)
Process completed with exit code 134.
build-linux (3.12)
The strategy configuration was canceled because "build-linux._3_11" failed
build-linux (3.12)
The operation was canceled.
build-linux (3.9)
The strategy configuration was canceled because "build-linux._3_11" failed
build-linux (3.9)
The operation was canceled.
build-linux (3.10)
The strategy configuration was canceled because "build-linux._3_11" failed
build-linux (3.10)
The operation was canceled.