Add plan-bound runs, undo audit trail, and scoped approvals. #269
ci.yml
on: push
acceptance-p0
26s
use-case-matrix
29s
test-telemetry
17s
lint
22s
package
23s
Matrix: test
acceptance-all
43s
Annotations
5 errors
|
test (3.12)
Process completed with exit code 1.
|
|
test (3.11)
The strategy configuration was canceled because "test._3_12" failed
|
|
test (3.11)
Process completed with exit code 1.
|
|
test (3.10)
The strategy configuration was canceled because "test._3_12" failed
|
|
test (3.10)
The operation was canceled.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
use-case-matrix
|
1.5 KB |
sha256:466fabb88cb5767a228bcdf668f8050c23660d84c17fc4cf6108f373cfdeff0f
|
|